Home
About
Company Profile
Development History
Corporate Honors
Corporate Culture
HarmoPower's Perspective
Intellectual Property Center
Solution
Product Center
Full current control system
Centralized flexible energy storage system
Direct-hanging flexible energy storage system
Mobile energy storage system
Service Center
Service support
Service Policy
News&Information
Company News
Industry News
Contact
Sales Center
Chinese | English
Full current control system solution
Centralized flexible energy storage solution
Directly-mounted flexible energy storage solution
Overseas Grid-Side Energy Storage Projects (Under Construction)
12 Jan,2026
Project Capacity: 175 MW / 350 MWh Product Series: Centralized Flexible Energy Storage (MMB1.0) Project Overview: The implementation of this project will not only help alleviate local power supply pressures and enhance power supply security, but also play a crucial role in promoting the region’s transition to renewable energy and achieving its “carbon neutrality” goals by providing clean electricity and reducing greenhouse gas emissions.
Gansu Independent Shared Energy Storage Project
Project Capacity: 105 MW / 420 MWh Product Series: Centralized Flexible Energy Storage (MMB1.0) Project Overview: As a key node in the regional energy system, this project, once connected to the grid, will serve as a “super power bank” for the local power grid, significantly enhancing the capacity to accommodate new energy sources and optimizing peak-shaving operations of the grid. It represents a benchmark project for building a new-type power system.
Anhui Chaohu Industrial and Commercial Energy Storage Project
Project Capacity: 20 MW / 40 MWh Product Series: Direct-Connect Flexible Energy Storage (MMB2.0) Project Overview: This project reduces the company’s annual operating costs by approximately 5.2 million yuan, leveraging cutting-edge energy storage technology to drive its green transformation and enhance energy efficiency.
Southern Power Grid Foshan Grid-Side Energy Storage Project
Project Capacity: 10 MW / 20 MWh Product Series: Centralized Flexible Energy Storage (MMB1.0) Project Overview: This project is the largest grid-side independent energy storage power station in the Guangdong-Hong Kong-Macao Greater Bay Area and the largest single-phase grid-connected energy storage power station built in China to date. Its commissioning directly increases Guangdong’s total operational capacity of new energy storage by 20%, making it a key project for supporting the region’s energy structure transformation.
Jiangsu Suqian User-Side Project
Project Capacity: 4.472 MW / 13.416 MWh Product Series: Centralized Flexible Energy Storage (MMB1.0) Project Overview: By implementing a “two-charge, two-discharge” strategy, the project achieves an annual discharge capacity of 6 million kWh. This intelligent operational model has brought substantial peak-valley arbitrage benefits to the enterprise, successfully converting green technology into tangible economic returns.
Oil Drilling and Production Energy Storage Project
Project Capacity: 1.67 MW / 3.34 MWh Product Series: Centralized Flexible Energy Storage (MMB1.0) Project Overview: This project leverages peak-valley arbitrage and diesel generator optimization strategies to significantly reduce energy costs in the oilfield operating area. Its scalable, long-cycle, and zero-failure reliable operation provides critical technical support for green and low-carbon drilling operations.
Details
→
Foshan Rifeng Enterprise User-Side Project