Xiamen Hechu Energy Technology Co., Ltd.

  • Home

  • About

    • Company Profile

    • Development History

    • Corporate Honors

    • Corporate Culture

    • HarmoPower's Perspective

    • Intellectual Property Center

  • Solution

  • Product Center

    • Full current control system

    • Centralized flexible energy storage system

    • Direct-hanging flexible energy storage system

    • Mobile energy storage system

  • Service Center

    • Service support

    • Service Policy

  • News&Information

    • Company News

    • Industry News

  • Contact

    • Sales Center

Chinese   |   English

Search
Solution

Full current control system solution

Centralized flexible energy storage solution

Directly-mounted flexible energy storage solution

  • Home page
Overseas Grid-Side Energy Storage Projects (Under Construction)

Overseas Grid-Side Energy Storage Projects (Under Construction)

12 Jan,2026

Project Capacity: 175 MW / 350 MWh Product Series: Centralized Flexible Energy Storage (MMB1.0) Project Overview: The implementation of this project will not only help alleviate local power supply pressures and enhance power supply security, but also play a crucial role in promoting the region’s transition to renewable energy and achieving its “carbon neutrality” goals by providing clean electricity and reducing greenhouse gas emissions.

MORE
Gansu Independent Shared Energy Storage Project

Gansu Independent Shared Energy Storage Project

12 Jan,2026

Project Capacity: 105 MW / 420 MWh Product Series: Centralized Flexible Energy Storage (MMB1.0) Project Overview: As a key node in the regional energy system, this project, once connected to the grid, will serve as a “super power bank” for the local power grid, significantly enhancing the capacity to accommodate new energy sources and optimizing peak-shaving operations of the grid. It represents a benchmark project for building a new-type power system.

MORE
Anhui Chaohu Industrial and Commercial Energy Storage Project

Anhui Chaohu Industrial and Commercial Energy Storage Project

12 Jan,2026

Project Capacity: 20 MW / 40 MWh Product Series: Direct-Connect Flexible Energy Storage (MMB2.0) Project Overview: This project reduces the company’s annual operating costs by approximately 5.2 million yuan, leveraging cutting-edge energy storage technology to drive its green transformation and enhance energy efficiency.

MORE
Southern Power Grid Foshan Grid-Side Energy Storage Project

Southern Power Grid Foshan Grid-Side Energy Storage Project

12 Jan,2026

Project Capacity: 10 MW / 20 MWh Product Series: Centralized Flexible Energy Storage (MMB1.0) Project Overview: This project is the largest grid-side independent energy storage power station in the Guangdong-Hong Kong-Macao Greater Bay Area and the largest single-phase grid-connected energy storage power station built in China to date. Its commissioning directly increases Guangdong’s total operational capacity of new energy storage by 20%, making it a key project for supporting the region’s energy structure transformation.

MORE
Jiangsu Suqian User-Side Project

Jiangsu Suqian User-Side Project

12 Jan,2026

Project Capacity: 4.472 MW / 13.416 MWh Product Series: Centralized Flexible Energy Storage (MMB1.0) Project Overview: By implementing a “two-charge, two-discharge” strategy, the project achieves an annual discharge capacity of 6 million kWh. This intelligent operational model has brought substantial peak-valley arbitrage benefits to the enterprise, successfully converting green technology into tangible economic returns.

MORE
Oil Drilling and Production Energy Storage Project

Oil Drilling and Production Energy Storage Project

12 Jan,2026

Project Capacity: 1.67 MW / 3.34 MWh Product Series: Centralized Flexible Energy Storage (MMB1.0) Project Overview: This project leverages peak-valley arbitrage and diesel generator optimization strategies to significantly reduce energy costs in the oilfield operating area. Its scalable, long-cycle, and zero-failure reliable operation provides critical technical support for green and low-carbon drilling operations.

MORE
Overseas Grid-Side Energy Storage Projects (Under Construction)

Overseas Grid-Side Energy Storage Projects (Under Construction)

Details

→

Overseas Grid-Side Energy Storage Projects (Under Construction)

Gansu Independent Shared Energy Storage Project

Gansu Independent Shared Energy Storage Project

Details

→

Gansu Independent Shared Energy Storage Project

Anhui Chaohu Industrial and Commercial Energy Storage Project

Anhui Chaohu Industrial and Commercial Energy Storage Project

Details

→

Anhui Chaohu Industrial and Commercial Energy Storage Project

Southern Power Grid Foshan Grid-Side Energy Storage Project

Southern Power Grid Foshan Grid-Side Energy Storage Project

Details

→

Southern Power Grid Foshan Grid-Side Energy Storage Project

Jiangsu Suqian User-Side Project

Jiangsu Suqian User-Side Project

Details

→

Jiangsu Suqian User-Side Project

Oil Drilling and Production Energy Storage Project

Oil Drilling and Production Energy Storage Project

Details

→

Oil Drilling and Production Energy Storage Project

Foshan Rifeng Enterprise User-Side Project

Foshan Rifeng Enterprise User-Side Project

Details

→

Foshan Rifeng Enterprise User-Side Project

Centralized flexible energy storage solution

Centralized flexible energy storage solution

Details

→

Centralized flexible energy storage solution

Full current control system solution

Full current control system solution

Details

→

Full current control system solution

< 12 >
Contact Us Recruitment

5th Floor, No. 1-1, Guoyuan Road, Tongxiang High-tech Zone, Xiamen Torch High-tech Zone

Ms. Sun, Marketing Management Department  +86 18591933413

Scan with WeChat

Scan to follow us

©2023 Copyright: Xiamen HarmoPower Tech Co., Ltd.   Powered by:CEglobal

Business License